home / aphis_reports / citations

citations: 1311

This data as json

rowid hash_id code kind repeat desc narrative
1311 624a1c3bc334b835 3.131(a)   0 SANITATION. The rubber mats placed in the "maze" in Rm 156 are not joined leaving gaps that will allow waste material and water to run through. The mats are covering a slatted concrete floor for drainage but any material passing through these gaps can potentially accumulate on the slats.The mats are hosed down regularly but no chemicals or detergents are used for organic material. The mats shall be moved, cleaned and sanitized to prevent buildup of material under them. Correct by October 22, 2016. This inspection and exit interview were conducted with the Associate VP of Research and Compliance, Director of URAR, Director of Animal Care and the Director of Clinical.
Powered by Datasette · Queries took 158.692ms